OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
FS#4592 — cloud/vrack network
Scheduled Maintenance Report for Network & Infrastructure
Completed
We upgrade the Nexus switches in the network cloud/vrack in order to solve problems of DHCP related to the functioning with the mode dual-home of fex (one fex connected on two different chassis). In order to minimize the impact, we set up a completely separate infra and switch links one by one (few seconds of interruption by link).




Update(s):

Date: 2010-09-23 10:35:41 UTC
on Friday, 17 septembre 2010, 03:35

Date: 2010-09-23 10:32:56 UTC
on Friday, 17 September 2010, 03:35

All migrations are completed.

Date: 2010-09-23 10:32:10 UTC
on Friday, 17 September 2010, 02:09

The 48-port 7th module has been switched.
Cut about 1 minute.

We prepare for the 8th module.

Date: 2010-09-23 10:31:28 UTC
on Friday, 17 September 2010, 01:45

The 48 port 6th module has been switched.
Cut about 1 minute.

We prepare for the 7th module.


Date: 2010-09-23 10:30:41 UTC
Friday, 17 September 2010, 01:23

The 48 port 5th module has been switched.
Cut about 1 minute.

We prepare for the 6th module.

Date: 2010-09-23 10:29:37 UTC
on Friday, 17 September 2010, 00:33

The 48 port 4th module has been switched.
Cut about 1 minute.

We prepare for the 5th module.

Date: 2010-09-23 10:28:39 UTC
on Friday, 17 September 2010, 00:19

We take the upgrades

Date: 2010-09-16 12:20:02 UTC
1/3 of the infrastructure is updated.
We will finish the upgrade tonight.

Date: 2010-09-16 11:35:07 UTC
The upgrade is ongoing.
Posted Sep 14, 2010 - 17:06 UTC