Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
We upgrade the Nexus switches in the network cloud/vrack in order to solve problems of DHCP related to the functioning with the mode dual-home of fex (one fex connected on two different chassis). In order to minimize the impact, we set up a completely separate infra and switch links one by one (few seconds of interruption by link).
Update(s):
Date: 2010-09-23 10:35:41 UTC on Friday, 17 septembre 2010, 03:35
Date: 2010-09-23 10:32:56 UTC on Friday, 17 September 2010, 03:35
All migrations are completed.
Date: 2010-09-23 10:32:10 UTC on Friday, 17 September 2010, 02:09
The 48-port 7th module has been switched.
Cut about 1 minute.
We prepare for the 8th module.
Date: 2010-09-23 10:31:28 UTC on Friday, 17 September 2010, 01:45
The 48 port 6th module has been switched.
Cut about 1 minute.
We prepare for the 7th module.
Date: 2010-09-23 10:30:41 UTC Friday, 17 September 2010, 01:23
The 48 port 5th module has been switched.
Cut about 1 minute.
We prepare for the 6th module.
Date: 2010-09-23 10:29:37 UTC on Friday, 17 September 2010, 00:33
The 48 port 4th module has been switched.
Cut about 1 minute.
We prepare for the 5th module.
Date: 2010-09-23 10:28:39 UTC on Friday, 17 September 2010, 00:19
We take the upgrades
Date: 2010-09-16 12:20:02 UTC 1/3 of the infrastructure is updated.
We will finish the upgrade tonight.
Date: 2010-09-16 11:35:07 UTC The upgrade is ongoing.