FS#4637 — Roubaix 1: electrical switching on generators.
Scheduled Maintenance Report for Network & Infrastructure
Completed
In order to connect the rescue cable of our new source post
of Roubaix 2, EDF needs that we liberate a part of our installations
of Roubaix 1 and 3 (cabling in an EDF cell, then an obligatory
interruption of right and left cells via an internal EDF procedure).

The liberation of Roubaix 1 and 3 will take place on the morning of Tuesday, the 28th of September, 2010.

Meanwhile, the data centre will be powered by the Generators.
EDF also ensures a relief during this manipulation with a possible
return on the EDF network feasible in minutes.

Update(s):

Date: 2010-09-28 11:04:43 UTC
We are back to the EDF network. The maintenance tasks were finished.

Date: 2010-09-28 09:01:47 UTC
ERDF has finished the manoeuvres.
We will switch again on the EDF network.

Date: 2010-09-28 09:00:22 UTC
We are currently turning on the generators.
In a few minutes, ERDF will isolate us from the network.

Date: 2010-09-28 08:57:33 UTC
We will switch the load to the generators.
Posted Sep 24, 2010 - 14:29 UTC